Blocked highway surface water drain
Reported via mobile in the Blocked/Damaged category anonymously at 12:03, Thursday 25 July 2024
Sent to West Northamptonshire Council less than a minute later. ref: 6274635.
The surface water drain at ///bootleg.grandest.books, east of the Millers Way bellmouth junction on the B4525 has been blocked for several years. During heavy rain, the junction floods with surface water travelling downhill to the next drain on Millers Way, some 30m away. This surface water presents a particular hazard in cold weather, when the road surface becomes icy. Standing water is also damaging the repaired road surface around the drain.
Updates
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by West Northamptonshire Council at 12:03, Thursday 25 July 2024
-
Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the WNC Highways Inspection Manual, the defect meets the requirement for a Priority 4 repair. We will schedule a repair to be completed within 26 weeks. Our current average response time for a Priority 4 repair is 37.3 days.
Posted by West Northamptonshire Council at 08:44, Monday 29 July 2024
-
Investigation: Completed (Defect Found), Defect Repair: Scheduled
State changed to: Action scheduled
Posted by West Northamptonshire Council at 07:17, Sunday 22 September 2024
-
Investigation: Completed (Defect Found), Defect Repair: Ongoing
State changed to: In progress
Posted by West Northamptonshire Council at 13:02, Monday 7 October 2024
-
There has been no progress with this defect in 60 days (since marked as ongoing) or 75 days (since marked scheduled). The defect now presents a serious danger to road users and pedestrians. Additionally, the noise of vehicles going over the defect render the three bedrooms of my house unfit for sleeping. The drain being blocked is contributing to road erosion in wet weather.
Posted anonymously at 16:05, Friday 6 December 2024
-
Investigation: Completed (Defect Found), Defect Repair: Ongoing - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on 6274635 and add updates. The expected completion date for these works will be on or before 27/1/25
Posted by West Northamptonshire Council at 13:11, Monday
-
An expected completion date of 27th January is more than six months since the first reporting activity date on this defect reference. In this time, the defect has progressed from a drainage inconvenience with minor surface damage to a serious danger to road users including cyclists and pedestrians, and their property. Loose road surface stones are being fired at pedestrians on the pavement by passing vehicles. The condition is deteriorating rapidly on a daily or hourly basis. Ignoring the escalated risk this defect presents leaves the local Highways Authority and their appointed contractor, Kier, directly liable.
Posted anonymously at 14:27, Monday
-
Investigation: Completed (Duplicate), Defect Repair: Ongoing - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order was raised and patching works around gully was carried out yesterday 10/12/24 should you notice any further defects please inform us via an update to your existing enquiry
Posted by West Northamptonshire Council at 07:47, Wednesday