Blocked drain flooding road and potentially properties

Reported via mobile in the Blocked/Damaged category anonymously at 21:04, Tuesday 24 September 2024

Sent to West Northamptonshire Council less than a minute later. ref: 6506724.

Flooded road caused by blocked drain near to the T section into and towards the entry into bottom of Excalibur Close NN54BJ - left hand side adjacent to large conifer trees.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by West Northamptonshire Council at 21:04, Tuesday 24 September 2024

  • WNC visited at 03.00 am 24th September. Drain has now been cleared and surface water has drain away. Thankyou

    State changed to: Fixed

    Posted anonymously at 21:12, Tuesday 24 September 2024

  • Questionnaire filled in by problem reporter; State changed to: Fixed, 21:12, Tuesday 24 September 2024

  • Investigation: Ongoing - Thank you for your enquiry. West Northants received approximately 140mm of rain over a short period of time, resulting in severe flash flooding in many areas. The heavy rainfall had the ability to overwhelm the surface water drainage system. If your report is a repeat flooding incident, please could update this enquiry with further information, so that we can investigate. If this is not a repeat incident, we will close the enquiry after 7 days and the highways team will continue to monitor the location

    State changed to: Investigating

    Posted by West Northamptonshire Council at 11:56, Wednesday 25 September 2024

  • Drain again blocked today 19th 0ctober. Drain needs cleaning or investigating why water is pooling for this particular drain in the street Photos attached.

    Posted anonymously at 09:26, Saturday 19 October 2024

  • Thank you for providing an update. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    Posted by West Northamptonshire Council at 09:26, Saturday 19 October 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the WNC Highways Inspection Manual, the flooding has been assessed and requires a Priority 4 response. We will schedule drainage investigation work to be completed within 26 weeks. When the investigation has been completed, we will inform you of our findings and course of action. Our current average response time for a Priority 4 is 38 days.

    Posted by West Northamptonshire Council at 09:21, Monday 21 October 2024

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by West Northamptonshire Council at 09:45, Friday 15 November 2024

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing

    State changed to: In progress

    Posted by West Northamptonshire Council at 09:11, Wednesday 20 November 2024

  • Hi, this is the pooling of water today 24 November. Appreciate there is a lot of rainfall etc, but can you elaborate on the defect found, and what is the ongoing repair, and the soft date for completion please.

    Posted anonymously at 14:30, Sunday 24 November 2024

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on 6506724 and add updates. The expected completion date for these works will be 21/04/2025.

    Posted by West Northamptonshire Council at 08:17, Monday 25 November 2024

  • Thank you. We are aware of the earlier case raised in September 2024 which residents are tracking and monitoring. Can you please be more specific on the “defect found” and the remedy please.

    Posted anonymously at 19:59, Monday 25 November 2024

  • Investigation: Completed (Duplicate), Defect Repair: Ongoing - Thank you for your enquiry. We can confirm that we have been made aware of this issue and a works order has been raised on a routine safety inspection. The expected completion date for these works will be 21/04/25

    Posted by West Northamptonshire Council at 22:04, Tuesday 26 November 2024

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a West Northamptonshire Council FixMyStreet password?