Blocked watercourse

Reported via mobile in the Blocked/Damaged category anonymously at 12:21, Saturday 4 January 2025

Sent to West Northamptonshire Council less than a minute later. ref: 6929895.

Blocked water course which is diverting water accross the footpath and road which is then freezing creating a dangerously slippery surface.

Someone will fall and hurt themselves

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by West Northamptonshire Council at 12:21, Saturday 4 January 2025

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the WNC Highways Inspection Manual, the defect meets the requirement for a Priority 3 repair. We will schedule a repair to be completed within 28 days. Our current average response time for a Priority 3 repair is 16 days.

    Posted by West Northamptonshire Council at 12:15, Wednesday 8 January 2025

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by West Northamptonshire Council at 10:06, Friday 17 January 2025

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing

    State changed to: In progress

    Posted by West Northamptonshire Council at 11:44, Thursday 23 January 2025

  • Hi - I've been meaning to report this for some time, I see someone has. I have previously attended to this leak in years past, but my 'solution' has not worked this time. Hence reason to message is that if a council engineer arrives at site not being familiar with the setup, they may not know how to sort this. So key point is that the drain that's inside the spring below outlet elbow (so directly below the pipe, behind the railings) has become blocked. I have previously unblocked this with a stick/pole in the past, but this time I can't appear to free the drain. Hence the spring is overflowing through the hole in the front brickwork into the ACO drain.. The separate drain in the ACO to the right of the spring is taking the majority of the flow, but it can't cope (see pic with ACO cover lifted) . Hence the overflow. The solution I believe is to remove the steel railing and get proper drain rods in to clear the original main drain. If your need any further details, please contact me. Thanks, James.

    Posted by James Gale at 23:05, Sunday 9 February 2025

  • This is still not resolved. Today and on previously frosty days there is ice access the path. Someone will fall, someone will injure themselves.

    When will it be fixed?

    Posted anonymously at 10:32, Saturday 1 March 2025

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing - Thank you for your enquiry. We attended this location on 23/01/25 and cleaned the channel, a further priority 4 ticket has been raised to clean and jet mainline from the war memorial to the surgery. This will take place within the next 26 weeks and will include the channel outlet.
    For more information about our services, please visit https://www.westnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @wnhighways

    Posted by West Northamptonshire Council at 09:30, Wednesday 5 March 2025

  • Hi, I've noted the update above that someone has visited, but that a full jet/clear of the original drain (to confirm the one under the outlet NOT the ACO channel!!) to clear that could be 26 weeks away...?!? In which case it will be SUMMER before this is fixed. It's been frosty several nights this week and I've seen people slip on the ice, including young with pushchairs and older citizens going to the surgery. Surely it can be looked at quicker than 26 weeks!! regards, J.

    Posted by James Gale at 13:13, Thursday 6 March 2025

  • Investigation: Not Started (Defect Found), Defect Repair: Defect Found

    State changed to: Investigating

    Posted by West Northamptonshire Council at 21:45, Thursday 6 March 2025

  • Investigation: Completed (Defect Found), Defect Repair: Defect Found - Thank you for your enquiry. Although this has been raised as a priority 4 ticket we will endeavour to complete these works as soon as possible.
    For more information about our services, please visit https://www.westnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @wnhighways

    Posted by West Northamptonshire Council at 08:20, Tuesday 11 March 2025

  • I have contacted the environment agency about this and they have advised to make an official compliance against West Northamptonshire Council for the lack of action taken. There is now pond like stagnant water pooling all the way from where the water is leaking, all the way down to the entrance to Frog Hall. I have not seen anyone attend to even look at this issue and the channel certainly has not been cleaned out so these updates seem to be a work of fiction.

    Posted anonymously at 23:10, Sunday 23 March 2025

  • It’s getting worse and I’ve see a rat too ….

    Posted anonymously at 12:31, Thursday 27 March 2025

  • I have just cleared the problem. I lifted out the ACO drain covers by the grille. Cleared out the exit pipe from the gulley with a screwdriver, the water is now flowing down the drain and not across the footpath. I replaced the covers and it took less than 5 minutes. Until the drain is fixed properly , I suggest that when a blockage is notified, someone goes out and clears the ACO outlet with a screwdriver or similar or the broken ACO plastic pipe is repaired. WNC & SPC Councillor Dermot Bambridge

    Posted by Cllr Dermot Bambridge at 12:39, Monday 28 April 2025

  • The latest update is not entirely correct. Whilst I am not doubting the attempt to resolve - water is still leaking across the path and flooding into the highway.

    When will this be properly and fully resolved?

    Posted anonymously at 13:07, Monday 28 April 2025

  • Hi West Northamptonshire council. I would like to confirm that this issue is indeed NOT resolved yet. I do applaud Cllr Dermot actions in attempting to clear the drain. In my opinion it still needs a through drain-jet and clear. I have in the past been that person spending several minutes clearing the drain, note that this is the ORIGINAL one inside the metal grill, not the 'after-thought' one added with the ACO channel externally. In the past I have managed to clear the original drain, but not recently I've tried and tried and it must be badly blocked now as I cannot clear it. The amount of overflow will vary as with the lower rainfall the rate of the spring flow declines. So I don't want this to be forgotten in the summer months just because the flow subsides, once it rains again, the large overflow will re-start. So WNC , please can you advise when this will be properly be looked at (still at the 20+ weeks, per above??!) regards, J.

    Posted by James Gale at 17:56, Monday 28 April 2025

  • Investigation: Ongoing (Defect Found), Defect Repair: Defect Found - Thank you for your further enquiry. The Drainage Team have attended and 'cleaned and tested aco channel now which was flowing. However further works are required to jet the mainline due to jetting capabilities and will be completed within the next six months.

    Posted by West Northamptonshire Council at 13:18, Wednesday 25 June 2025

  • Investigation: Completed (Defect Found), Defect Repair: Defect Found - Thank you for your further enquiry. The Drainage Team have attended and 'cleaned and tested aco channel now which was flowing. However further works are required to jet the mainline due to jetting capabilities and will be completed within the next six months.

    Posted by West Northamptonshire Council at 13:32, Wednesday 25 June 2025

  • Nearly a year since I reported this. The problem went away because of the dry summer (drought).

    The rains have arrived - we have a frost forecast this week.

    When will this be resolved?

    Posted anonymously at 21:39, Monday 17 November 2025

  • Investigation: Completed (Duplicate), Defect Repair: Defect Found - Thank you for your enquiry. We can confirm that we have been made aware of this issue and a works order has been raised on a routine safety inspection. The expected completion date for these works will be 19/06/26

    Posted by West Northamptonshire Council at 07:50, Tuesday 18 November 2025

  • Photograph of ice across footpath and highway. This is dangerous. Someone will get hurt. A target date of the summer for resolution (when we will likely be in a drought state) is irresponsible.

    Posted anonymously at 08:41, Friday 21 November 2025

  • Investigation: Completed (Duplicate), Defect Repair: Defect Found - Thank you for your enquiry. We can confirm that we have been made aware of this issue and a works order has been raised on a routine safety inspection. The expected completion date for these works will be 19/06/26
    For more information about our services, please visit https://www.westnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @wnhighways

    Posted by West Northamptonshire Council at 13:57, Monday 24 November 2025

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a West Northamptonshire Council FixMyStreet password?